The Bendigo Line from Melbourne was opened on the 21st. of October 1862 and was built as a double line.
In 1998, with the co-operation of V/line Freight, Channel 5’s cameras joined the driver aboard a G Class locomotive for the journey from Tottenham to Bendigo.
This is now a historic record of the double line due to the fact that the line was singled beyond Kyneton in 2005 as part of the Regional FastRail Project.
Running Time: 90 minutes



